Today’s Special GET 15% OFF!

Why Standard Building Catalogs Can Limit Creative Park Design

Before construction can begin officials need to have real-world costs. Landscape architects require building specifications. Contractors also require drawings that are able to estimate their costs. Before the construction begins, officials need to know the exact cost estimates. Landscape designers need construction specifications. Contractors need drawings they can rely on to estimate.

Even a well designed project may be subject to revisions or budgetary issues if these pieces are delivered too late. For communities that are considering public restroom buildings, choosing a reputable design and supply partner in the early stages will have a major impact.

Image credit: romtec.com

It is possible that the first drawing may be needed for the purpose of funding, but not for construction.

Many of the public-private recreational projects are initiated much before the budget to build is passed. Park authorities may be developing a grant proposal or a capital improvement plan, or getting approval from local officials. A design concept for the building and a believable cost estimate, can help decision makers understand the proposed facility.

Romtec offers pre-designed designs and estimates without fees upfront, assisting clients in these initial planning phases. The project teams are able to explore building configurations and material options before committing to a final construction approach.

Creative Freedom Needs Technical Support

Landscape architects generally would like park structures to match the surroundings, not be a generic structure. A recreation center with a waterfront may require unique exterior finishings. Meanwhile, a community sports facility may require coordinated restrooms.

Finding the best park building designer for these projects means looking beyond attractive renderings.

Designers or partners in construction must understand the building methods including layouts, materials, construction methods and building regulations. Romtec collaborates with landscape architects to provide design-build information while also allowing for the flexibility of architectural styles and materials. The collaboration preserves the desired design while segregating the design from the construction.

The Bid Package is Where Good Ideas Become Buildable

Visually appealing concepts don’t give contractors enough information to create reliable bids. Contractors must have clear drawings, accurate details on the materials, construction specifications and a clear scope of the work.

The most skilled park toilet designers are aware that documentation is crucial for moving from the planning phase to the acquisition phase of a project.

Romtec provides design drawings, specifications and renderings to be used in bid packages. The construction process is speeded up through the preparation of engineering plans and supporting documents following project approval. For public owners, coordinated documentation can reduce the uncertainty regarding what contractors are required to deliver.

Prefabricated doesn’t always mean better

The method of delivery to the construction site makes a huge difference. Certain prefabricated structures are shipped in a mostly assembled condition. Romtec often uses a different method: it supplies construction materials kits and plans to construct the structure on the project site.

Site-built construction allows for customized architectural elements, conventional concrete foundations, as well as materials familiar to local contractors. Romtec also allows partial prefabrication and tilt-up components as well as set-in-place construction when necessary.

The ideal park bathroom builder should be able explain what construction techniques are appropriate for the design, layout and budget, not simply recommending a particular one.

Make sure the team is connected

The creation of public parks requires many parties with different responsibilities. Landscape architects develop the overall vision for the park. Engineers are responsible for addressing technical requirements. Owners have to take into consideration funding, approvals and long-term operation. Contractors are responsible for building.

Miscommunication between these groups can lead to unnecessary revisions. Romtec provides the design, material, documentation and turnkey installation options to help with projects.

Our expertise goes far beyond toilets. We also build concession buildings, pavilions as well as other public structures.

Early coordination is key to starting off with a positive note

Before they become expensive adjustments, it’s recommended to take care of details of construction before they become a problem. Owners need to confirm that the design is correct, know the construction method and document requirements as soon as possible.

Although a pleasing park is important for success, the appearance is not the only factor that can guarantee that the project will succeed.

If the creative spirit of architects is backed by concrete engineering, clear specifications, and planned construction, communities are better equipped to design public spaces that are able to meet their goals and provide services to visitors for many years to in the future.

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

Scroll to Top